excerpt: "TL;DR Why financing & the migration path now have to be planned together ERP projects rarely fail because of the target software. They fail on the way there: data quality, downtime, parallel operation and test cycles. That is where DataMigrate..."
taxonomy_category:
  - "General"
  - "Products and services"
---

Contents

- [TL;DR](#tl-dr)
- [Why financing & migration path now have to be thought through together](#why-financing-migration-path-now-have-to-be-thought-through-together)
- [The 511/512 program - what really counts](#the-511-512-program-what-really-counts)
- [Which costs in a DataMigrate Pro project are typically eligible for funding](#which-costs-in-a-datamigrate-pro-project-are-typically-eligible-for-fu)
- [Checklist for CFO/project management](#checklist-for-cfo-project-management)
- [Arguments for the bank meeting (DataMigrate Pro)](#arguments-for-the-bank-meeting-datamigrate-pro)
- [Roadmap (compact)](#roadmap-compact)
- [Conclusion](#conclusion)

## TL;DR

- The KfW‑ERP‑Förderkredit Digitalisierung (no. 511/512) finances software, implementation and internal and external project costs - including ERP implementation and data migration.
- From level 2 there is a repayment grant (up to 3 %), in level 3 up to 5 % (cap: 200.000 €). Always apply through your bank before the project starts.
- DataMigrate Pro addresses the critical path (direct migration NAV -> Business Central, parallel operation/Live‑Sync, low downtime) - these services are eligible for funding.

## Why financing & migration path now have to be thought through together

ERP projects rarely fail because of the target software; they fail on the way there: data quality, downtime, parallel operation and test cycles. This is exactly where DataMigrate Pro comes in: direct migration from Dynamics NAV/Navision to Dynamics 365 Business Central, if required with bidirectional live synchronization for parallel operation over a limited period. That measurably lowers risk and project effort and fits the funding logic of the KfW (digitalization of processes, interfaces, training).

## The 511/512 program - what really counts

- Funding purpose: digitalization projects from basic to high end; in addition to investments, ongoing project-related costs are also eligible.
- Target groups: freelancers, SMEs and larger mid-sized companies with annual group revenue of up to 500 million € (levels 2/3). Level 1 only for SMEs (with a digitalization check).
- Levels & grant: level 1 = no grant; level 2 = up to 3 %; level 3 = up to 5 % of the disbursed loan; maximum grant amount 200.000 €.
- Drawdown: 511 up to 24 months, 512 up to 12 months from commitment. In level 2/3 no commitment fee; in level 1 from month 7.
- Risk assumption (512): KfW takes on 50 % of the credit risk -> makes financing easier when collateral is tight.
- Aid: an interest rate reduction counts as aid; note the subsidy value & de minimis/GBER. Submit the grant application (level 2/3) together with the loan application.

## Which costs in a DataMigrate Pro project are typically eligible for funding

- Software: DataMigrate Pro licenses/editions and - if relevant during the project period – Business Central licenses.
- Implementation & services: migration concept, mapping/ETL‑pipelines, delta‑runs, validation/logging, Cutover‑plan, training.
- Project effort: external consulting costs (IO Integrated) and internal personnel costs (key users/IT) within the project period (max. 24 months).

## Checklist for CFO/project management

- Describe the project clearly: goals (time/error rate/costs), scope (data packages, integrations), parallel operation/Live‑Sync, Cutover, benefit indicators.
- Determine the level: level 1 (loan only, digitalization check mandatory), level 2 (grant up to 3 %), level 3 (5 % grant; threshold: loan > 3 % of group revenue).
- Separate the cost structure in a KfW‑compatible way: software, implementation, internal & external personnel costs; project period ≤ 24 months.
- Document package: gBzA, SME self‑declaration (if relevant), de‑minimis, cumulation declaration, submit the grant application together with the loan application.
- Timing: application before the start of the project; no subsequent financing of measures already begun.

## Arguments for the bank meeting (DataMigrate Pro)

- Direct migration NAV -> Business Central (without jump versions).
- Bidirectional live synchronization enables parallel operation without hard downtime. That reduces business risk considerably.
- Validation/logging & audit-proof runs, delta handling; supports old NAV/Navision releases through to current BC versions.
- Measurably reduces project and operating risk; counts towards "LevelUp‑Digitalisierung" (level 2) or, for large projects, towards "HighEnd" (level 3).

## Roadmap (compact)

- Preliminary project (2–4 weeks): target state, data packages, list of integrations, Cutover plan, level classification, funding check (cost matrix).
- Bank appointment & application: choose 511 or 512; apply for the grant (level 2/3) at the same time; keep the documents complete.
- Migration with DataMigrate Pro: set up Live-Sync, iterative delta runs + UAT, Cutover, hypercare.
- Grant payout: apply through the financing partner once the loan has been paid out in full.

## Conclusion

- DataMigrate Pro reduces the technical risk (direct migration, parallel operation) - that makes credit decisions easier and supports a classification in level 2/3.
- Classic mistakes: starting before the application, failing to separate costs cleanly, stretching the project beyond 24 months or choosing the wrong level.

*Note: This article does not replace advice from your bank or KfW. Funding requirements, conditions and state aid frameworks can change. The current KfW documents and commitments are authoritative.*

About the author

#### Sascha Marquardt

Responsible for the partner programme, the licensing business and commercial project delivery.

Keep reading## More from the IOI blog

[General IO Integrated Strengthens Its US Presence with the New IO Integrated USA Inc. Closer to the US market, with a sharper focus on Business Central migrations and M&A scenarios 15. September 2026 · 8 minutes](https://ioi.gmbh/en/2026/09/15/io-integrated-usa-inc-strengthens-us-presence/)
[DataMigrate Pro DataMigrate PRO Synch-Service Setting up and running the service bus listener as a Windows service – from the prerequisites to settings.json 24. October 2025 · 4 minutes](https://ioi.gmbh/en/2025/10/24/datamigrate-pro-synch-service/)
[DataMigrate Pro Working with Configuration Data Six ways to move configurations between Business Central, the local installation and a ZIP archive – with the matching commands 23. October 2025 · 2 minutes](https://ioi.gmbh/en/2025/10/23/working-with-configuration-data/)

## From reading to action. Book your upgrade check.

In the free upgrade check we analyse your current Navision or NAV version and show you the direct path to Business Central – including effort, sequence and a fixed-price range.

[Book a free Upgrade-Check →](/en/business-central-upgrade-check/)
[Give us a quick call: +49 214 8402 3000](tel:+4921484023000)

✓ Directly from any Navision or NAV version

✓ Live test while the legacy system keeps running

✓ C/AL→AL conversion included

✓ Fixed-price range and timeline afterwards