---
title: "Real-Time Integration of Cost Accounting with Finance"
id: "997966"
type: "post"
slug: "real-time-integration-of-cost-accounting-with-finance"
published_at: "2024-02-13T16:47:23+00:00"
modified_at: "2026-09-02T06:07:31+00:00"
url: "https://ioi.gmbh/en/2024/02/13/real-time-integration-of-cost-accounting-with-finance/"
markdown_url: "https://ioi.gmbh/en/2024/02/13/real-time-integration-of-cost-accounting-with-finance.md"
excerpt: "Allocations in controlling usually generate postings that have no effect on financial accounting. These postings do not update general ledger transaction figures; they are postings that stay within controlling. If, however, an allocation in controlling changes the functional area or..."
taxonomy_category:
  - "General"
---

Contents

- [Integration](#integration)

Allocations in controlling usually generate postings that have no effect on financial accounting. These postings do not update general ledger totals; they are postings within controlling only. However, if an allocation in controlling leads to a change of the functional area or of another attribute that is relevant for reporting in financial accounting, this causes a shift between the affected items in the profit and loss statement. This information therefore has to be transferred to financial accounting. This reconciliation between controlling and financial accounting takes place through the real-time integration.

The real-time integration allows all controlling documents to be transferred to financial accounting immediately. Financial accounting is therefore reconciled with controlling at all times.

For every posting in controlling a document is created in financial accounting. As a result, all the detailed information that is also contained in the CO documents is available in the reports of the new general ledger at any time, broken down by e.g.:

- Functional area
- Cost center
- Internal order

## Integration

The real-time integration we implement replaces the reconciliation postings listed above. Every cost type involved in a reallocation that is relevant for the profit and loss statement is given an assigned general ledger account. Every allocation in controlling then leads to an assigned general ledger entry via the real-time integration.

About the author

#### Sascha Marquardt

Responsible for the partner programme, the licensing business and commercial project delivery.

Keep reading## More from the IOI blog

[General IO Integrated Strengthens Its US Presence with the New IO Integrated USA Inc. Closer to the US market, with a sharper focus on Business Central migrations and M&A scenarios 15. September 2026 · 8 minutes](https://ioi.gmbh/en/2026/09/15/io-integrated-usa-inc-strengthens-us-presence/)
[DataMigrate Pro DataMigrate PRO Synch-Service Setting up and running the service bus listener as a Windows service – from the prerequisites to settings.json 24. October 2025 · 4 minutes](https://ioi.gmbh/en/2025/10/24/datamigrate-pro-synch-service/)
[DataMigrate Pro Working with Configuration Data Six ways to move configurations between Business Central, the local installation and a ZIP archive – with the matching commands 23. October 2025 · 2 minutes](https://ioi.gmbh/en/2025/10/23/working-with-configuration-data/)

## From reading to action. Book your upgrade check.

In the free upgrade check we analyse your current Navision or NAV version and show you the direct path to Business Central – including effort, sequence and a fixed-price range.

[Book a free Upgrade-Check →](/en/business-central-upgrade-check/)
[Give us a quick call: +49 214 8402 3000](tel:+4921484023000)

✓ Directly from any Navision or NAV version

✓ Live test while the legacy system keeps running

✓ C/AL→AL conversion included

✓ Fixed-price range and timeline afterwards
